Search filters this STIG's checks locally. Separate terms must all match (use quotes for an exact phrase). A search you ran on the Search page carries over here.
Assessment Title
Rule Text
The Infoblox system must notify the system administrator when a component failure is detected.
Description
Discussion Text
Predictable failure prevention requires organizational planning to address system failure issues. If components key to maintaining systems security fail to function, the system could continue operating in an insecure state. The organization must be prepared and the application must support requirements that specify if the application must alarm for such conditions and/or automatically shut down the application or the system.
This can include conducting a graceful application shutdown to avoid losing information. Automatic or manual transfer of components from standby to active mode can occur, for example, upon detection of component failures.
This can include conducting a graceful application shutdown to avoid losing information. Automatic or manual transfer of components from standby to active mode can occur, for example, upon detection of component failures.
New to STIG checklists? Read What is a STIG checklist? and CKL vs CKLB.