Search filters this STIG's checks locally. Separate terms must all match (use quotes for an exact phrase). A search you ran on the Search page carries over here.
Assessment Title
Rule Text
In the event of a logging failure caused by the lack of audit record storage capacity, the SMS must continue generating and storing audit records, overwriting the oldest audit records in a first-in-first-out manner using Audit Log maintenance.
Description
Discussion Text
It is critical that when the TPS is at risk of failing to process audit logs as required, it takes action to mitigate the failure.
The IDPS performs a critical security function, so its continued operation is imperative. Since availability of the TPS is an overriding concern, shutting down the system in the event of an audit failure should be avoided, except as a last resort.
The IDPS performs a critical security function, so its continued operation is imperative. Since availability of the TPS is an overriding concern, shutting down the system in the event of an audit failure should be avoided, except as a last resort.
New to STIG checklists? Read What is a STIG checklist? and CKL vs CKLB.